~ A full renovation of the existing 3500 sq ft facility including architectural features, branding and design. ~ A Macintosh computer lab for engineering software, CAD, programming, and 3D printing. ~ A Maker Space to include laser cutting and wood working stations. ~ The formation of a Robotics Team with training facilities and tool supply. ~ An Engineering Club (already formed) to work on capstone projects such as an autonomous vehicle.